On-Target/BUDGETWORKS -- a web application that puts buildings on energy
budgets is now available. It uses a [near real-time] data feed from AcquiSuite data
recorders.

On-Target/BUDGETWORKS can do the following:
1. Monitor actual energy use and cost (with 15-minute updates).
2. Calculate energy and cost savings relative to a Baseline.
3. Simulate the impact of energy conservation changes before they are made.
4. Calculate the "slip", if any, of actual use after the changes are made.
5. BUDGETWORKS puts buildings on an energy budget. If Personnel are expected to
operate the facility in accord with the budget, operational savings will occur and
buildings will continue to operate at peak efficiency.

On-Target/BUDGETWORKS is the "killer app" of energy services and performance
contracting. It can be used to:
- store the results of an audit,
- simulate present performance,
- calculate the energy/cost impact of various changes before they are implemented,
- track actual savings after implementation, and
- encourage efficient operation.

On-Target/BUDGETWORKS is unique.

See Classic BUDGETWORKS
here.

Home

"On-Target"

Principal

Grants

Clients

BudgetWorks

Controls

Lighting Retrofit

Contact Us










Budgetworks
On-line Demo
On-Target/BUDGETWORKS
 
McNally Engineers, Ltd.
energy services / engineering
BudgetWorksTM, AutoSchedulerTM , On-TargetTM, and Run-RightTM are trademarks of McNally Engineers, Ltd.
AcquisuiteTM  and ObviusTM are trademarks of Obvius Holdings LLC.   
© 2007
-2008  McNally Engineers, Ltd.
Why On-Target?            Value Proposition           Process           Elements           Features
On-Target Process
To reach the goals of the On-Target
Value Proposition, an on-going
process is used.

Economic balance.
While funding is required initially, the
client must see a return on the
investment made. Multi-year cash flow
projections are made at the on-set of
the program.

Benefits.
The benefits of the On-Target
Process are:

1) It ensures that operations
improvements are not lost
2) It verifies that savings did result
from the measures implemented
3) It identifies problems as they
occur
4) It provides the data to re-
calibrate the economics of
future improvements.